|
|
|||||||
![]() |
|
||||||
|
|
|||||||
|
Ilshin Spinning Group - Seoul
|
|
||||||
|
|
|||||||
|
For the new building of the greatest textile company - Ilshin Spinning Group - in Seoul, we delivered a group of three lifts.
In order to realize a transparent and filigree lift system, our doors with underfloor door drive were mounted also in this project. The lift car with glass ceiling and illuminated glass floor fascinates with its transparency and perfectly fits the building which is flooded with light and designed with glass and stainless steel. |
Technical details:
Group of 3 lifts
Rated load 1.300 kg
8 Stops
Travel 28 m
Suspension 2:1
Rated speed 1,50 m/s
Build in 2009
|
|
|||||
|
|
|||||||
|
|
|||||||
|
|
|||||||
![]() |
|
||||||
|
|
|
|
|
|
|
|
|
